West Midlands Signalling Centre Refurbishment

West Midlands Signalling Centre Refurbishment

Client: Network Rail

Project Value: £700k

Completion Date:  February 2020

Jamieson secured the upgrade works to the West Midlands Signalling Centre through Network Rail’s competitive tender process.

The on-going work of the signal centre was Jamieson’s top priority and consequently Jamieson phased the works to ensure there were always toilets and kitchens available.

We liaised daily with the centre staff over […]

Trafford Park Platform Renewal

Trafford Park Platform Renewal

Client: Network Rail

Project Value: £337k

Completion Date: January 2020

Jamieson secured this project to carry out concrete repairs to Trafford Park Station and install new GRP coverings to both platforms.

This station is located in Manchester and was an important commuter station as it serviced Trafford Park Industrial and Manchester city centre. The existing platform was formed from pre-cast concrete […]

Birmingham New Street – Assisted Travel Lounge

Birmingham New Street – Assisted Travel Lounge

Client: Network Rail

Project Value: £157k

Completion Date:  June 2019

Jamieson’s were chosen by Network Rail to create a new Assisted Travel Lounge at Birmingham’s New Street Railway Station, one of the UK’s busiest stations.

This project was carried out at a very busy major railway station in a city centre location with limited access for deliveries and […]

Birchfield Primary School – Toilet Refurbishment

Birchfield Primary School – Toilet Refurbishment

Client: Birchfield Primary School

Project Completion: May 2019

Project Value: £235k

We were appointed as the main contractor for a full refurbishment of eight toilet blocks within Birchfield Primary School, project value £235k. As the school was kept operational throughout the project, we delivered our works over four different phases completing in May 2019.

We delivered the project over […]

Public Health England Oxford

Public Health England Oxford

Client: Public Health England

Project Completion: April 2019

Project Value: £150k

Jamieson’s were awarded the contract to carry out essential office upgrades for Public Health England’s Centre for Radiation, Chemical and Environmental Hazard, Chilton, Oxfordshire. The works involved the refurbishment of offices and laboratories within the occupied building.

The works were to be completed in a live environment, requiring us to […]

Walton Summit Encapsulation Works

Walton Summit Encapsulation Works

Client: Network Rail

Project Value: £160k

Completion Date:  January 2019

Jamieson Contracting were appointed by Network Rail to complete the removal and replacement of the roof cladding on a live and operational facility.

The current roof cladding contained asbestos, requiring a stringent health and safety measures. Following its removal, Jamieson’s reclad the building with a new cladding with fire resistant insulation […]

Maidenhead Railway Station – Car Park Resurfacing and Layout Works

Maidenhead Railway Station Car Park – Resurfacing & Layout works

Client: Network Rail

Project Duration: 3 Days

Project Value: £78,000

 

Network Rail approached Jamieson Contracting to carry out repairs and refurbishment work to Maidenhead car park after recent track improvement works damaged the surfacing. As Maidenhead is a commuter hub for London the TOC and Network Rail decided only half the car park would […]

Frances Street – New Build Development

Frances Street – New Build development of Three, 3 bedroom homes

Client: Private Developer

Project Duration: 6 Months

Project Value: £450,000

Jamieson Contracting were approached by the client with a project in mind to provide a small development of high standard family housing in the Hyde area. Using our in house property expertise Jamieson were able to identify a couple of land opportunities that […]