TfGM Decarbonisation Scheme

Client: Transport for Greater Manchester (TfGM)

Start Date: September 2021

End Date: July 2022

Project Value: £2.8m

This project for TfGM involved working across eight sites to deliver low carbon technology upgrades in line with the GMCA’s carbon reduction programme.

The project was delivered across various transport locations in Greater Manchester, including 2 Piccadilly Place (2PP), Metrolink Queens Road Depot, Metrolink Trafford Depot, Hyde Bus […]

Design, Refurbishment, and Installation Works at BAE Systems Barrow-in-Furness Site

Client: BAE Systems

Start Date: 2020

End Date: Various / Ongoing

Value: £ Various

Since 2020, JCL have delivered multiple schemes for BAE Systems at their high-security Barrow-in-Furness site. Projects have included the manufacture, supply, and installation of bespoke fire doors and access systems and the design and refurbishment of laboratories and stores. Following the success of our refurbishment works project in 2022, JCL […]

Kings Norton Autumn Water Tanks Renewal

Client: Network Rail

Start Date: December 2021

End Date: August 2022

Project Value: £660k

JCL were appointed by Network Rail to replace the 100,000L Water Tanks at Kings Norton Train Station. The depot is used for filling trains with water for clearing leaves off the tracks, and JCL were required to install two new water tanks double the capacity of the existing installation.

Following contract […]

Centre for Radiation, Chemical and Environmental Hazards (CRCE) Extension

Client: UK Health Security Agency

Project Value: £650k

Completion: July 2022

This project for the UK Health Security Agency (UKHSA) involved a single storey extension and internal alterations at CRCE Leeds, to provide new and upgraded training facilities, staff welfare areas and breakout spaces.

To allow for future expansion of the building, the works have been designed and constructed to accommodate another floor through […]

Merseytravel Tolls Extension

Client: Merseytravel

Project Value: £351k

Completion Date: June 2022

This project for Merseytravel delivered a new extension to the police and tolls building at the Wallasey/Kingsway Tunnel.

Procured through an open tender route, the scheme had complex access requirements, located adjacent to an occupied building and within close proximity to the operational tolls and a live highway.

Key to the delivery of this project was […]

Oasis Academy Clarkesfield

Oasis Academy ClarkesfieldRefurbishment and Extension

Client: Oasis Trust

Project Completion: November 2021

Project Value: £4m

Jamieson’s were awarded this project for the extensive refurbishment of a Victorian school and four new extensions through a competitive tender process. In line with Local Authority requirements, the school has been increased from a two-form entry to a three-form entry primary school provision for each year […]

Brodsworth Sewer Treatment Works

Brodsworth Sewer Treatment Works

Client: English Heritage

Project Value: £360k

Completion Date: November 2021

Jamieson Contracting have recently completed extensive sewer treatment works and the installation of new drainage at Brodsworth Hall for English Heritage.

Brodsworth Hall and its gardens are a Grade 1 listed and protected site, built in the 1860s and now owned by English Heritage as a heritage visitor attraction.

This site had […]

Abbey Hey Primary School Extension and Refurbishment

Abbey Hey Primary School Extension and Refurbishment

Client: United Learning

Project Completion: September 2021

Project Value: £360k

This contract delivered the design and build of a new link extension and the refurbishment of two modular classroom at Abbey Hey Primary School in Manchester. We were awarded the project at RIBA Stage Three and worked closely with the school to develop the design, ensuring it […]