Case Studies

TfGM Decarbonisation Scheme

Client: Transport for Greater Manchester (TfGM)

Start Date: September 2021

End Date: July 2022

Project Value: £2.8m

This project for TfGM involved working across eight sites to deliver low carbon technology upgrades in line with the GMCA’s carbon reduction programme.

The project was delivered across various transport locations in Greater Manchester, including 2 Piccadilly Place (2PP), Metrolink Queens Road Depot, Metrolink Trafford Depot, Hyde Bus […]

Design, Refurbishment, and Installation Works at BAE Systems Barrow-in-Furness Site

Client: BAE Systems

Start Date: 2020

End Date: Various / Ongoing

Value: £ Various

Since 2020, JCL have delivered multiple schemes for BAE Systems at their high-security Barrow-in-Furness site. Projects have included the manufacture, supply, and installation of bespoke fire doors and access systems and the design and refurbishment of laboratories and stores. Following the success of our refurbishment works project in 2022, JCL […]

Kings Norton Autumn Water Tanks Renewal

Client: Network Rail

Start Date: December 2021

End Date: August 2022

Project Value: £660k

JCL were appointed by Network Rail to replace the 100,000L Water Tanks at Kings Norton Train Station. The depot is used for filling trains with water for clearing leaves off the tracks, and JCL were required to install two new water tanks double the capacity of the existing installation.

Following contract […]

Centre for Radiation, Chemical and Environmental Hazards (CRCE) Extension

Client: UK Health Security Agency

Project Value: £650k

Completion: July 2022

This project for the UK Health Security Agency (UKHSA) involved a single storey extension and internal alterations at CRCE Leeds, to provide new and upgraded training facilities, staff welfare areas and breakout spaces.

To allow for future expansion of the building, the works have been designed and constructed to accommodate another floor through […]