3 Piccadilly Place – Office Re-fit

Project Title: Large office refurbishment

Client: Public Health England – Project Design by Pick Everard

Project Duration: 7 Weeks

Project Value: £260,000.00

Scope: To carry out substantial refurbishment and remodelling works throughout the floor

JCL were engaged by PHE to carry out refurbishment work to their Manchester Offices which comprised of:

Demolish to existing office space
Reconfiguration of office layout to suit PHE’s business needs
Supply and installation […]

Leigh Bus Station Refurbishment

Project Title: Leigh Bus Station Refurbishment

Client: Transport for Greater Manchester

Project Duration: 6 Months (March – September 2015)

Project Value: 1.5M

Scope: To carry out extensive remodelling and refurbishment works to Leigh Bus Station.

Externally

Re-glazing and structural steel alterations to the existing bus station stands
Alterations to existing levels throughout the station to accommodate guided bus way
The installation of a large bespoke cycle hub including […]

Cromwell High School

Project Title: Cromwell High School Extension and Refurbishment

Client: Inspired Spaces/Tameside Borough Council

Client Contact: Chris McKenzie-Grieve – LEP Manager

Project Duration: 6 Months

Project Value: £1,600,000.00

Scope: To Re-build the main part of the school and refurbish other areas as result of fire.

 

Cromwell High School is a specialist, state funded high school for disabled children or those with learning difficulties. It is nestled in […]

Jamieson Contracting – GMCC Social Value Bronze Award!

Jamieson Contracting are pleased to accept a company award from Greater Manchester Chamber of Commerce in recognition for their hard work and time dedicated towards social value in the GM area.

The GM Social Value Awards have been launched by GMCC to coincide with Volunteer’s Week 2017. GMCC created the awards programme to formally recognise hard work, time and resources that […]